Skymetro passenger tunnel, Zurich Airport

  • The Passenger Transport (PTS) Tunnel forms part of the fifth construction phase at Zurich Airport.
  • Two tunnel bores with 6.28 m diameter, each 880 m long. Single-skin tubbing construction in ground water.

Hydro-shield heading with sealed tubbings 1.2 m long, single-skin tunnel.

Map

Specific figures

Contract value

CHF 66.8 million

Construction period

2000 - 2001

Length

880 m

Total excavated surface

31 m2