Pont de la Machine and platform, Geneva
Construction of a platform upstream from the Pont de la Machine.
Construction of a metal platform on steel columns with a surface area of 616 m2 covered with larch decking and connected to the "Pont de la Machine" by a metal staircase and metal platform for disabled access.
Map
Divisions performance
Vibro-sinking of of 30 steel piles (355.6/16) of between 15 and 44m and 11 to 40m struts. Implementation and positioning control during sinking by laser beams. Bracing of piles and main structure with adjustable steel rods, positioned and adjusted by at a team of divers. Provisioning on the river Rhône and assembly of steel frame (98t) using a floating pontoon equipped with a cable shovel. The decking of the platform (616 m2) is constructed using larch wood frame and panels.
Zusätzliche Dienstleistungen und Services
Specialities
River work
Underwater work
Work involving vibratory sinking of steel piles
Project design
Jean-Pierre Perrin (Ti SA)
Specific figures
Project ownerCity of Geneva
Amount for our servicesCHF 2,660,000
Construction period25.06.2007-31.12.2009 (30 months)
Contact for questions about the project | |
|---|---|
| Implenia Construction SA | |
| Telefon: +41 22 795 89 82 | |
| Location Onex/Genève | E-Mail: info.geneve@implenia.com |

