Lausanne M2 metro line, lot 1700
- Metro line from Ouchy to Epalinges, via main railway station and Place de l'Europe. Total length 6 km, 14 stations, 9 tunnels and 5 bridge structures.
- Lot 1700: "Route de Berne" Tunnel between the Sallaz and Fourmi stations. Sallaz station and cut-and-cover construction. Fourmi underground station including interior construction, access shaft.
- Heading with roadheader machine.
- Construction methods using pipe umbrella and horizontal jetting to consolidate the excavation profile and stabilise the working face.
- Rock secured with steel installation or anchors, plus reinforcement mesh and shotcrete.
Map
Specific figures
Contract valueCHF 36 million
Construction periodMarch 2004 - April 2007
Length839 m
Total excavated surface58 m2
Contact for questions about the project | |
|---|---|
| Implenia Industrial Construction | |
| Telefon: +41 43 233 39 90 | |
| E-Mail: Sandra.Guetg@implenia.com | |