A4/A20 Hafnerberg Tunnel, Birmensdorf
The Hafnerberg Tunnel forms part of the A4/A20 Zurich west bypass. It connects the Birmensdorf junction with Reppichstal. Each direction (Basel and Lucerne) has a separate tunnel bore with two driving lanes and a shoulder lane.
Main heading from Reppichstal with two access points. Drill and blast heading with emulsion explosives. In unconsolidated ground a total of 17 pipe umbrella sections. In Lunnerental, counter heading from 3 access points. 19 stage pipe umbrellas from the portals.
Map
Specific figures
Contract valueCHF 90 million
Construction period2000 - 2004
Length3400 m
Total excavated surface135 m2
Contact for questions about the project | |
|---|---|
| Implenia Industrial Construction | |
| Telefon: +41 43 233 39 90 | |
| E-Mail: Sandra.Guetg@implenia.com | |